Background Image Background Image Background Image
Find us on Facebook
contact us

Gollifer Langston Architects
25 Poland Street
Soho
London
W1F 8QN

020 7734 2134

Gollifer Langston

< 1 of 3 > < 2 of 3 > < 3 of 3 >

Broadwater Farm ILC

Broadwater Farm Leaning Campus

 

client: London Borough of Haringey

 

 

The proposal is a fully inclusive learning campus for children aged 3-11 with 420 mainstream primary and 100 children with Special Needs including PMLD and ASD, bringing together Broadwater Farm Primary, William C Harvey and Moselle schools with the adjacent Children’s Centre on their existing site at Broadwater Farm in Haringey. 

 

A phased approach keeps the existing schools in operation through the construction stage as the new building is constructed around the existing buildings. 

The development follows the successful Children’s Centre, also by GLA, which received a RIBA award in 2007